Water Main Replacement on Grace Ave.
From Adrian Suarez at LADWP April 5 Hello everyone,
Work is scheduled to begin on April 8th on Grace Ave, from Franklin Ave to Whitley Terrace. You will see an outside contractor (Penhall) performing saw cutting on the street, along with the delivery of steel road plates. Please observe all posted No Parking signs during this time to help ensure the work can be completed safely and without delays.
Thank you,
Adrian Suarez
Department of Water and Power
Water Distribution Division
Water Utility Supervisor
Tel.: (213) 783-5506
Fax: (213) 367-5574
11 Views

Very helpful. Thanks Terrell.